Comprehensive solution for power start-up, Poland
Supporting the launch of one of Poland’s largest power plants with demineralized water
Our client is a global leader in engineering specializing in thermal power and environmental technologies. They provide comprehensive services, including development, design, manufacturing, construction, and commissioning of turnkey fossil-fired power plants.
The Challenge
Our client played a pivotal role in the construction and commissioning of one of Poland’s largest power plants—a high-efficiency 500MW brown coal-fired unit. Leveraging their longstanding relationship with Mobile Water Solutions, the client approached our team to support the power plant’s start-up (Phase 1) by providing 100m³/h of demineralized water.
Warning: foreach() argument must be of type array|object, false given in /var/www/staging.60446.cwadigital.co.uk/wp-content/themes/plott-os/templates/blocks/three-col-content-001/three-col-content-001.php on line 37
The Solution
Mobile Water Solutions responded by supplying four mobile filtration units MOFI RW300F, one mobile filtration unit MOFI 3×60, one mobile reverse osmosis unit MORO 4×25 T, one mobile deionization unit MODI 15000 T, and one mobile pump MOPS 170i. The mobilization commenced with a three-week production period, followed by three weeks of standby, and concluded with an additional five days of demineralized water production.
Warning: foreach() argument must be of type array|object, false given in /var/www/staging.60446.cwadigital.co.uk/wp-content/themes/plott-os/templates/blocks/three-col-content-001/three-col-content-001.php on line 37
Benefits
Our competitive technology offering, coupled with our local presence, facilitated swift response, asset delivery, and seamless communication with the on-site team, ensuring the successful launch of one of Poland’s largest power plants.
Warning: foreach() argument must be of type array|object, false given in /var/www/staging.60446.cwadigital.co.uk/wp-content/themes/plott-os/templates/blocks/three-col-content-001/three-col-content-001.php on line 37
Secure flawless plant commissioning with Mobile Water Solutions
Download