Learn more

Discover who we are, explore our latest blog posts, and gain real-world insights through our case studies.

Treated water production for demineralization chains at a metal company

Temporary treated water production for demineralization chains

Our customer owns an integrated site that delivers its products mainly to the Mediterranean markets. The site produces more than 120 grades of steel, specializing in technical steel for pipelines and electrical steel. Around half of the site’s products are for the automotive industry.

 

Contact your local team to discuss your project

The Challenge

The customer contacted Mobile Water Solutions to establish a temporary water production unit for the rehabilitation of the local storage of the two demineralization chains.

 

 


Warning: foreach() argument must be of type array|object, false given in /var/www/staging.60446.cwadigital.co.uk/wp-content/themes/plott-os/templates/blocks/three-col-content-001/three-col-content-001.php on line 37

The Solution

Mobile Water Solutions implemented the MORO 4X25T reverse osmosis technology, capable of producing 80 m³/h of water. Our service operated 24/7, providing daily visits and rapid interventions, typically within 2 hours. This partnership ensured a reliable and consistent water supply for the site’s needs.

 

 


Warning: foreach() argument must be of type array|object, false given in /var/www/staging.60446.cwadigital.co.uk/wp-content/themes/plott-os/templates/blocks/three-col-content-001/three-col-content-001.php on line 37

Benefits

Mobile Water Solutions provided a steady 80m³/h water supply, improving process capacity. Moreover, our quick response time, with our team onsite within days of an inquiry, helped minimize disruptions and enhance overall efficiency for the site.

The initial contract was for a 2-week period however due to delays on site the rental period was extended week per week as long as needed.


Warning: foreach() argument must be of type array|object, false given in /var/www/staging.60446.cwadigital.co.uk/wp-content/themes/plott-os/templates/blocks/three-col-content-001/three-col-content-001.php on line 37
24/7 support
Flexible arrangements
Quick response time

Applied solutions

The solutions we provided for our client

MORO 4x25

Improve your water management strategy with Mobile Water Solutions

Download